Main work is done on 2016. French drain Water entrance Main drain to the city Kitchen cabinet and countertop was changed in two units Garage roof is replaced 50% in 2014 New gutter is installed 3 sides of the buildinghot water tank: two of them are changed on 2023, one is 2024 The stairs to second floor and second floor balcony: changed in 2023 spent $13K 2023 Roof: not only changed the roof, but also removed the plywood on the roof, increase the space between attic, add insolation and improve air circulation, total: 28695$ (roof is still under guarantee) 2021: New kitchen updated and new kitchen cabinet installed on unit 96 for $17K 202